Levee Repairs along the Columbia River on Bridgeton Road

WHO WE ARE / PROJECTS

PEN2

Levee Repairs along the Columbia River on Bridgeton Road

Date

April 19, 2019

Project Manager:

Sunny Simpkins

Project Summary:

In Spring 2017, there were two periods of high water along the Columbia River that caused erosion of portion of the levee system along Bridgeton Road in North Portland. To protect the levee against additional erosion, PEN 2 contracted an excavator to reinforce the levee system.

Benefit:

Protect PEN 2 levee from additional erosion, which could undermine the function of the levee system.