Sandy Pump Station Pump Repair

WHO WE ARE / PROJECTS

SDIC

Sandy Pump Station Pump Repair

Date

April 19, 2019

Project Manager:

Josh McNamee

Project Summary:

During the winter of 2018, one of the pumps at the Sandy Pump Station became unusable, requireing a replacement. Later that summer, a replacement pump was manufactured and installed in the Sandy Pump Station. Everything was back up and running for the fall 2018 flood season.

Benefit:

Protected landowners from the risk of flooding by providing pump redundancy for larger storms.